Automated parcel and pallet flow for warehouses and factories
Our team has worked in logistics automation since 2009. From Istanbul we deliver systems built by established manufacturers in China to projects in Türkiye, Europe and the Middle East: a complete line under our contract, or one package under yours.
How we work, in 80 seconds
From receiving to shipping, the factory test and one contact. No sound needed: on-screen text in English and Turkish.
From receiving to shipping
We supply each stage of the warehouse flow as standalone equipment or as one integrated system.
-
Conveying and transport
Pallet and case conveyors, spirals and vertical lifts, with AGVs and AMRs where a fixed line does not fit.
-
Storage
Pallet AS/RS with stacker cranes, and miniload or four-way shuttle systems for totes and cartons.
-
Picking
Goods-to-person workstations and robotic piece picking guided by 3D vision.
-
Sorting
Cross-belt, swivel-wheel and pop-up sorters, sized to your parcel mix and peak hourly volume.
-
Palletizing and shipping
Robotic palletizing and depalletizing cells, with 3D vision for mixed cases.
Why work with us
China's intralogistics equipment has matured: conveyor modules, sorters, shuttles, stacker cranes and palletizing cells are mostly standard models now, with clear specifications and predictable lead times and prices. When a standard model does not fit, Chinese manufacturers are used to adapting the line, the carriers and the interfaces to the site; drawings and technical files can be included in the scope of supply.
We work in two roles. For distribution centres and factories we sign the contract for the complete line and are responsible for delivering it: equipment selection, manufacturing control and the factory acceptance test, controls and software integration, installation and commissioning, and support after handover; the manufacturers in China work as our subcontractors. For main contractors and system integrators we take the conveying, sorting, storage or palletising package under your contract, to your specification, schedule and site rules.
Three ways to work with us
For system integrators
Standard modules from established Chinese manufacturers, with technical drawings, the manufacturer's conformity documents and spare-parts lists, ready to build into your own projects.
For main contractors
We welcome long-term cooperation with main contractors and integrators in any country: the conveying, sorting, storage or palletizing package of your project can be subcontracted to us and executed to your schedule, specifications and site rules.
For distribution centers and factories
A complete line under one contract with us, from layout and throughput calculation to manufacturing, factory acceptance, installation and commissioning.
How a project runs
-
Layout and throughput
We study your floor plan, parcel or pallet mix and peak hours, and propose a layout with capacity figures.
-
Offer and manufacturing
The equipment is built by established manufacturers in China, working as our subcontractors. You receive one offer and sign one contract with us.
-
Factory acceptance
Before shipping, the line is tested at the factory. You can attend in person or follow by live video.
-
Installation and service
Installation, commissioning, operator training and a spare-parts plan can be included in the scope of supply.
Tell us about your site
Send a floor plan, or simply describe your expected volumes. Main contractors and integrators interested in cooperation are welcome to write as well. Write in any language; we reply in the same language.