For main contractors and integrators

If you run a warehouse or factory project in Türkiye, Europe or the Middle East, we can take the intralogistics part, or a piece of it, as your subcontractor and deliver it under your contract, to your schedule and site rules.

Sliding-shoe sorter lines in a parcel hub

Three levels of cooperation

Equipment and modules

Standard modules — conveyors, sorters, shuttles, stacker cranes, palletising cells — with drawings, interface data, the manufacturer's conformity documents and a spare-parts list, ready to build into your own system.

A subcontracted package

The conveying, sorting, storage or palletising package of your project: designed, manufactured, tested and installed by us, to your specification, schedule and site rules. You keep one contact for the whole package.

Engineering support

Layout and throughput checks, equipment selection, coordination with suppliers in China in Chinese, FAT witnessing on your behalf, and Turkish-speaking coordination on site.

What we take on, and what we do not

What we take on

  • Mechanical equipment, controls and control software for our package
  • Interfaces to your WMS or main controls, defined in an interface document
  • FAT at the factory, installation, commissioning and SAT for our package
  • Documents: drawings, schematics, manuals, conformity documents, as-built files
  • Spare-parts plan and training; on-site service as agreed

What we do not do

  • Building, civil works, floor slabs and steel structures of the building
  • Fire protection, sprinklers and building permits
  • Power supply to our main panels and site utilities
  • Our own WMS software: we connect to yours

Send us the package

A specification, a layout or just the scope you want to subcontract is enough to start. Write in any language; we reply in the same language.