Skip to Content

About EMMANUEL

EMMANUEL is an intralogistics equipment and project company registered in İstanbul. We deliver conveying, sorting, storage, robotic palletising and AGV/AMR equipment from established manufacturers in China to projects in Türkiye, Europe and the Middle East.

Belt conveyors in a parcel hub

Company details

Legal name
E MMANUEL İÇ VE DIŞ TİCARET LTD. ŞTİ.
Company type
Limited liability company (Ltd. Şti.), Türkiye
Registered office
Şirinevler Mh. Adnan Kahveci Bul. Karanfil İş Merkezi No:184/8, 34188 Bahçelievler, İstanbul, Türkiye
MERSİS number
0323126405500001
Trade registry number
433782-5 (İstanbul)
Working languages
Turkish, English, Chinese. Write in any language; we reply in the same language.
Markets
Türkiye, Europe, the Middle East
Office hours
Monday–Friday 09:00–18:00 (Türkiye time, UTC+3)
Contact
info@emmanuel.com.tr · +90 543 446 45 10

What we supply

Equipment, as single machines or one system

  • Conveying and transport: pallet and case conveyors, spiral conveyors, vertical lifts, AGVs, AMRs and tugger AGVs
  • Storage: pallet AS/RS with stacker cranes, miniload and four-way shuttle systems
  • Picking: goods-to-person stations and 3D-vision robotic picking
  • Sorting: cross-belt, swivel-wheel, sliding-shoe and matrix sorters, singulation and automatic induction
  • Palletising and shipping: robotic palletising, depalletising, mixed-case palletising and automated truck loading

Software

  • The equipment's own control and fleet software comes with the equipment
  • Interfaces to your existing WMS or ERP are defined for each project
  • We do not sell a WMS of our own: we connect to yours

How our team works

One team, three cities: İstanbul handles customers and commercial matters, Belgrade handles project management and engineering, Shanghai handles technology and the supply chain. Whatever the size of the project, you keep one contact from the first enquiry to handover.

EMMANUEL is a new company; the team's experience comes from years in China's intralogistics industry. Projects the team has worked on

Commercial & Client Relations · İstanbul

Priscila Wang | Commercial Lead

Customer requirements, commercial enquiries, offers and contract management, and commercial coordination in Türkiye. The customer's main point of contact, from the first enquiry to project delivery.

Based in İstanbul. Languages: Turkish, Chinese, English.

priscila.wang@emmanuel.com.tr

Project Management & Engineering · Belgrade

Zhiyong Wang | General Manager

Runs the company and is accountable for project delivery: project planning, equipment layout and throughput assessment, schedule management, and coordination with main contractors, equipment suppliers and system integrators.

Founder of the company, in the intralogistics industry since 2009. Languages: Chinese, English. His background

zhiyong.wang@emmanuel.com.tr

Technical & Supply Chain · Shanghai

Jay Deng | Technical Director

Equipment selection, technical evaluation of the solution, selection of manufacturers and management of production progress, and coordination of the factory acceptance test (FAT) and equipment delivery, so that the project meets its technical requirements and quality standards.

Previously worked at Dematic, an international intralogistics company, with experience in logistics automation equipment and engineering projects.

Language: Chinese.

jay.deng@emmanuel.com.tr

The founder

Zhiyong Wang founded EMMANUEL and runs it as General Manager. He has worked in warehouse and intralogistics automation since 2009, in sales, tendering and project work for racking, conveying, sorting and automated storage systems in China.

Where the experience comes from

  • Racking first: heavy-duty beam, mezzanine, drive-in and mobile racking, including hands-on installation work on site
  • Then sorting and conveying lines, and pharmaceutical distribution centres
  • Then pallet AS/RS and cold-store solutions
  • Then system projects: stacker-crane AS/RS, miniload and multi-level shuttles, conveying and palletising, AGV integration and WMS/WCS
  • Later, sales at a main contractor for system integration

What he takes on in a project

  • Collecting the requirements, and checking the data they rest on
  • Comparing layouts and equipment options against the throughput each one reaches
  • The structure of the offer, the pricing and the contract negotiation; he has drafted an AS/RS contract template
  • Project planning and schedule, and coordination with main contractors, equipment suppliers and system integrators

Systems signed, and the tenders behind them

As sales lead he signed nine system projects: two in sorting and conveying, seven in automated storage. The customers came from pharmaceutical distribution, injection moulding, food, film materials and heat treatment. The routes to those contracts differed as much as the systems did: requests for quotation from foreign-invested factories, public tenders by state-owned enterprises, several rounds of online bidding, and equipment packages subcontracted from system integrators.

These projects were delivered at former employers in China, not by EMMANUEL. Projects the team has worked on

From manufacturing to handover

EMMANUEL signs the contract in its own name and is responsible to you for delivering the system. We combine established manufacturing in China with our own engineering team, from equipment selection and manufacturing to installation and commissioning on site.

For main contractors and system integrators, we work as your subcontractor: we take on the conveying, sorting, storage or palletising package of your project, or supply standard modules for your own projects, and deliver under your contract.

How a project is delivered, step by step

  • Manufacturing and quality control: manufacturing partners are chosen for each project's technical requirements; we organise design, manufacturing and assembly and run the factory acceptance test (FAT) against the agreed specification.
  • Controls and software integration: our engineering team handles the control system, the automation software and the integration of the subsystems, so that they run as one line.
  • Installation and commissioning: engineers install and commission the system on site and take it through acceptance; EMMANUEL coordinates the work within its scope.
  • Support after handover: engineers can come to site when needed, and long-term resident support can be agreed separately.
  • Quality and compliance: the conformity documents for the equipment and the complete line, the division of responsibilities and the acceptance criteria are set out in the contract for each project's scope.

How we work

Our principles

  • No price list: every project gets a written offer once the site and volumes are known
  • One contact from the first drawing to handover, instead of several suppliers
  • Equipment is tested at the factory before it ships; you can witness the FAT in person or by live video
  • Drawings, the manufacturer's conformity documents (CE declarations, test reports) and spare-parts lists come with the equipment, as the project requires

Your data

  • Enquiries and website data are processed under the Turkish data protection law (KVKK)
  • Details are in our privacy notice

Have a project to discuss?

Send us your layout, what you need to move and your peak hour. Write in any language; we reply in the same language.