Skip to Content

Miniload AS/RS

High-density automatic storage for totes and cartons, feeding pick stations directly.

High-density automatic storage for totes and cartons, feeding pick stations directly.

A miniload AS/RS uses a light stacker crane to store and retrieve totes or cartons in a rack aisle and feeds goods-to-person pick stations, removing all walking for pickers. One crane completes over a hundred dual cycles per hour, which suits businesses with many SKUs, small items and high order-line counts.

Typical uses

  • Piece picking in e-commerce and retail
  • Spare-parts and electronic-component stores
  • Pharmaceutical wholesale
  • Tool and material buffers for production lines

Key figures

Rack height4–18 m
Tote sizes600×400 / 400×300 mm; cartons per project
Load per tote≤ 50 kg (two totes ≤ 100 kg)
Load handlingTelescopic forks or clamp-type, single or double deep
Travel speed≤ 300 m/min
Lift speed≤ 90 m/min
Capacity per crane80–150 dual cycles/h
SoftwareWMS + WCS with location and batch management

Figures are typical configuration ranges; exact specifications are set per project.

Options

  • 1–8 goods-to-person stations
  • Tote weighing and profile check
  • Link to automatic packing lines
  • Chilled version (+2 °C to +8 °C)

Scope of supply

  • Machine, drives and control cabinet, assembled and dry-run tested before shipping
  • The equipment's own control and fleet software; interfaces to your existing WMS / ERP as the project requires
  • Drawings: general arrangement, foundation and anchor plan, electrical schematics
  • Conformity documents for the equipment and the whole line, the split of responsibilities and the acceptance criteria are set out in the contract according to the project scope
  • Spare-parts list and wear-part recommendation; a first batch can ship with the equipment
  • Factory acceptance (FAT): attend in person or follow by live video
  • Installation, commissioning and operator training can be included in the offer

What we need for an offer

  • Number and size of totes, number of SKUs
  • Peak order lines per hour
  • Floor plan and clear height
  • Existing WMS

Request an offer for this equipment