Skip to Content

Goods-to-person pick station

Totes come to the picker, lights show where to put each item, several hundred lines per person-hour.

Totes come to the picker, lights show where to put each item, several hundred lines per person-hour.

A goods-to-person station is where shuttle, miniload or mobile-robot systems meet the operator. The source tote arrives at the bench, the screen shows item and quantity, a light marks the target order slot, the picker places the item and confirms, and the tote returns to storage. The bench is ergonomically laid out and can include weight checks and barcode verification.

Typical uses

  • Multi-order piece picking in e-commerce and retail
  • High-accuracy picking in pharma and cosmetics
  • Kitting for production lines
  • Returns receiving and verification

Key figures

Pick rate300–600 order lines/h (upper end with one item per line and a continuous tote flow)
Order slots6–40, for order totes or bags
Source totes600×400 mm, 1–2 presented at a time
GuidanceTouch screen, put-to-light and scan confirmation
VerificationWeight check, barcode check, optional photo record
Work height800–1,000 mm, adjustable

Figures are typical configuration ranges; exact specifications are set per project.

Options

  • Link to automatic case erecting and sealing
  • Scale and label printing
  • Seated or standing versions
  • Multilingual operator interface

Scope of supply

  • Machine, drives and control cabinet, assembled and dry-run tested before shipping
  • The equipment's own control and fleet software; interfaces to your existing WMS / ERP as the project requires
  • Drawings: general arrangement, foundation and anchor plan, electrical schematics
  • Conformity documents for the equipment and the whole line, the split of responsibilities and the acceptance criteria are set out in the contract according to the project scope
  • Spare-parts list and wear-part recommendation; a first batch can ship with the equipment
  • Factory acceptance (FAT): attend in person or follow by live video
  • Installation, commissioning and operator training can be included in the offer

What we need for an offer

  • Which storage system feeds the station
  • Peak order lines per hour and lines per order
  • Order container type (tote or bag)
  • Whether weight verification is required

Related equipment

Request an offer for this equipment