Line-side automated storage tower
A compact automated storage cabinet for the shop floor: small footprint, uses the height, stores small parts next to the line and delivers them at the press of a button or a scan.
A compact automated storage cabinet for the shop floor: small footprint, uses the height, stores small parts next to the line and delivers them at the press of a button or a scan.
A compact automated storage cabinet for the shop floor: small footprint, uses the height, stores small parts next to the line and delivers them at the press of a button or a scan.
A line-side automated storage tower is a self-contained, enclosed cabinet: inside are several levels of storage slots, and a lift in the middle fetches totes or trays on command and brings them to an access port at the front. It needs no aisle and no stacker crane, so it fits next to production lines, in narrow gaps between machines, or in buffer and temporary stores, using the height of the building. The modular structure can be dismantled and moved, or extended in stages. The cabinet has its own storage control software: stock is updated in real time, with stock counts and batch traceability, and it can connect to your MES / WMS. Chinese manufacturers launched new line-side models in 2026; height, load and speed are confirmed per model, and we check floor load and clear height on site.
| Height | Depends on the model; tall versions up to about 12 m |
|---|---|
| Slot load | Depends on the model; typically about 50 kg per slot |
| Load units | Totes or trays |
| Positioning | Laser and infrared, about ±5 mm (depending on the model) |
| Lift speed | About 0.8 m/s (depending on the model) |
| Access ports | One-sided or two-sided |
| Structure | Modular; can be dismantled, moved and extended in stages |
| Software | Built-in storage control: real-time stock, stock counts, batch traceability; interface to MES / WMS |
| Site | Floor load and clear height checked on site |
Figures are typical configuration ranges; exact specifications are set per project.