Matrix sorter
A grid of standard belt cells: small footprint, destinations added or removed as needed.
A grid of standard belt cells: small footprint, destinations added or removed as needed.
A grid of standard belt cells: small footprint, destinations added or removed as needed.
A matrix sorter routes parcels along any path through a grid of small belt cells to their destinations, without a loop sorter or spiral chutes. It suits buildings with low clear height, irregular floor plans or frequently changing destinations, and cells can be added over time. Throughput sits between a swivel-wheel and a cross-belt sorter.
| Throughput | 2,000–10,000 items/h |
|---|---|
| Parcel size | 100–800 mm long, 100–600 mm wide |
| Parcel weight | ≤ 30 kg |
| Destinations | 10–200, expandable |
| Cell size | About 600×600 mm, modular |
| Clear height | ≥ 2.5 m |
Figures are typical configuration ranges; exact specifications are set per project.