Skip to Content

Sorting systems

These are the equipment modules our projects are built from. Figures on each page are typical configuration ranges; the actual specification is designed around your site, your loads and your peak hourly throughput.

Submit project requirements

Automated put wall
Items from batch picking are put into order cells automatically, one by one, replacing the manual put wall; for e-commerce order consolidation, store allocation and returns sorting.
Bomb-bay sorter
The tray floor opens and the item drops into the chute or bag below: for polybags, bagged and flat items, with destinations packed close together.
Barcode scanning tunnel
A reader frame over the conveyor that reads barcodes on the top, the sides or all six faces, depending on the set-up; the number read decides where the item goes.
RFID tunnel and gate
Batch-reads the RFID tags inside a carton in one pass and checks the resulting tag list against the order; common in apparel and retail shipping and receiving.