Swivel-wheel sorter
Modular, low-cost and quick to install, for a dozen to a few dozen destinations.
Modular, low-cost and quick to install, for a dozen to a few dozen destinations.
Modular, low-cost and quick to install, for a dozen to a few dozen destinations.
A swivel-wheel sorter diverts parcels left or right with rows of steerable wheels; modules bolt onto straight conveyor sections to form a line without major building work. Throughput and destination count are below a cross-belt, but investment, footprint and installation time are much smaller, which suits small and mid-size hubs, outbound lane sorting by route, and pre-sorting ahead of a cross-belt. It suits cartons and totes with flat bottoms. Polybags, bagged goods and round items tend to slip or roll off line on the wheels and should go to a cross-belt instead.
| Throughput | 1,500–8,000 items/h |
|---|---|
| Parcel size | 100–1,000 mm long, 100–800 mm wide |
| Parcel weight | ≤ 50 kg |
| Divert angle | 30° / 45°, one or two sides |
| Module width | 600–1,200 mm |
| Destinations | 2–60 |
| Speed | ≤ 2.5 m/s |
Figures are typical configuration ranges; exact specifications are set per project.