Sorter components and spare parts
Cross-belt carriers, linear motors, swivel-wheel modules, tilt-tray and bomb-bay units, sorter controls: for replacing and refurbishing installed sorters or for integrators building their own.
Cross-belt carriers, linear motors, swivel-wheel modules, tilt-tray and bomb-bay units, sorter controls: for replacing and refurbishing installed sorters or for integrators building their own.
Cross-belt carriers, linear motors, swivel-wheel modules, tilt-tray and bomb-bay units, sorter controls: for replacing and refurbishing installed sorters or for integrators building their own.
After some years of service, carriers, belts, wheels and controls on a sorter reach replacement age. We supply parts compatible with the installed model: cross-belt carriers, linear-motor drives, contactless power, tilt-tray and bomb-bay assemblies and upgrades of the sorter controls. Swivel-wheel modules are also sold on their own to integrators who build their own sort lines. Parts must match the existing track, pitch and interfaces, so drawings or site measurements are checked before quoting.
| Cross-belt carriers | Sizes such as 440×600 and 500×700 mm, pitch about 600 mm; must match the existing sorter |
|---|---|
| Linear-motor drive | Typical line speed about 1–2.5 m/s |
| Swivel-wheel modules | 45° or 90° divert, width to suit the line |
| Tilt-tray and bomb-bay units | Made to the existing interfaces |
| Controls | PLC and sort-planning software with WMS / TMS interface |
Figures are typical configuration ranges; exact specifications are set per project.