Sliding-shoe sorter
The gentlest high-speed sort for cartons, built for case-level outbound in distribution centres.
The gentlest high-speed sort for cartons, built for case-level outbound in distribution centres.
The gentlest high-speed sort for cartons, built for case-level outbound in distribution centres.
A sliding-shoe sorter has a slat deck with shoes that slide diagonally at the divert point and push the case smoothly into a side lane; the case never leaves the deck. It sorts cartons and totes at high speed with low noise and minimal packaging damage, which makes it the usual choice for case-level outbound in retail distribution, food and beverage and pharma warehouses.
| Throughput | 4,000–12,000 cases/h |
|---|---|
| Case size | 150–1,200 mm long, 100–800 mm wide |
| Case weight | ≤ 50 kg; heavy-duty versions calculated separately, typically 60–80 kg |
| Divert angle | 20° / 30°, one or two sides |
| Speed | ≤ 2.5 m/s |
| Destinations | 4–100 |
| Minimum gap | ≥ 150 mm, more at high speed or with long cases; maintained by automatic gapping induction |
Figures are typical configuration ranges; exact specifications are set per project.