Skip to Content

Robot sorting system

Small robots on a raised deck drop parcels into chutes; capacity scales by robot count, and a site goes live in weeks.

Small robots on a raised deck drop parcels into chutes; capacity scales by robot count, and a site goes live in weeks.

A robot sorting system places each parcel on a small sorting robot that navigates by floor codes across a steel deck to the destination chute and drops it into the bag or tote below. The number of destinations depends on deck area, throughput on the number of robots, and both can be changed after go-live. With no fixed line, installation is short, which also suits leased buildings and seasonal businesses.

Typical uses

  • Last-mile and city parcel hubs
  • Order or channel sorting in e-commerce
  • Returns sorting
  • Leased or temporary facilities

Key figures

Throughput3,000–20,000 items/h, by robot count
Parcel weight≤ 5 kg (10 kg model available)
Parcel size≤ 600×400×300 mm
Destinations50–1,000
Deck height1.2–3 m, chutes and bag frames below
Robot speed≤ 3 m/s
InductionManual or automatic, top scanning
Deployment4–8 weeks after deck delivery

Figures are typical configuration ranges; exact specifications are set per project.

Options

  • Automatic induction with DWS
  • Bag-full alerts and automatic bag change
  • Single or double deck
  • Robots on a rental basis

Scope of supply

  • Machine, drives and control cabinet, assembled and dry-run tested before shipping
  • The equipment's own control and fleet software; interfaces to your existing WMS / ERP as the project requires
  • Drawings: general arrangement, foundation and anchor plan, electrical schematics
  • Conformity documents for the equipment and the whole line, the split of responsibilities and the acceptance criteria are set out in the contract according to the project scope
  • Spare-parts list and wear-part recommendation; a first batch can ship with the equipment
  • Factory acceptance (FAT): attend in person or follow by live video
  • Installation, commissioning and operator training can be included in the offer

What we need for an offer

  • Items per hour and daily peaks
  • Destinations and parcel size/weight
  • Floor plan, clear height and floor loading

Related equipment

Request an offer for this equipment