Skip to Content

Rail-guided vehicle (RGV)

Fast, heavy-duty transport on a straight or loop rail: the steadiest link between AS/RS and production.

Fast, heavy-duty transport on a straight or loop rail: the steadiest link between AS/RS and production.

A rail-guided vehicle runs on a fixed rail and suits fixed routes with high volumes and heavy loads, for example between several AS/RS aisle entries and several production lines. A straight rail carries one vehicle; a loop rail carries several at once. Power comes from a conductor rail or lithium battery; positioning is precise, and speed and reliability exceed free-ranging vehicles.

Typical uses

  • Multi-point links between AS/RS aisles and conveyors
  • Pallet and die transport in workshops
  • Heavy items (coils, moulds)
  • Shared inbound/outbound stations for several aisles

Key figures

Load1,000–3,000 kg (heavy-duty ≤ 10 t)
FormStraight shuttle or loop, single or multiple vehicles
SpeedAbout 60–160 m/min for 1–2 t pallets; about 20–60 m/min for heavy loads of several tonnes
Positioning±3 mm
PowerConductor rail or lithium battery
Onboard conveyorChain / roller, one or two load positions
ControlMulti-vehicle anti-collision and task dispatch

Figures are typical configuration ranges; exact specifications are set per project.

Options

  • Loop rails with curves and switches
  • Onboard lifting unit
  • High- or low-temperature versions
  • Rail guarding and personnel separation

Scope of supply

  • Machine, drives and control cabinet, assembled and dry-run tested before shipping
  • The equipment's own control and fleet software; interfaces to your existing WMS / ERP as the project requires
  • Drawings: general arrangement, foundation and anchor plan, electrical schematics
  • Conformity documents for the equipment and the whole line, the split of responsibilities and the acceptance criteria are set out in the contract according to the project scope
  • Spare-parts list and wear-part recommendation; a first batch can ship with the equipment
  • Factory acceptance (FAT): attend in person or follow by live video
  • Installation, commissioning and operator training can be included in the offer

What we need for an offer

  • Load and item to be carried
  • Number and layout of stations
  • Tasks per hour
  • Rail length and site conditions

Request an offer for this equipment