Skip to Content

Spiral conveyor

A continuous climb or descent across floors in the footprint of one circle.

A continuous climb or descent across floors in the footprint of one circle.

A spiral conveyor carries cases between levels on a continuously running helical belt, with no waiting for a carriage: throughput is higher than a lift, and the footprint is a circle of 2.5–4 m diameter. Typical places are multi-storey warehouses, mezzanine pick areas and the levels of a sorter. A double spiral runs up and down at the same time.

Typical uses

  • Continuous flow between floors and mezzanines
  • Linking sorter induction and chute levels
  • Production floor to an upper-level warehouse

Key figures

Lift height1–12 m
Throughput≤ 2,000 cases/h per spiral
Belt width400–1,000 mm
Unit weight≤ 50 kg
FootprintOuter diameter 2.5–4 m
FormSingle or double (up and down), left- or right-hand
Unit heightTypically ≤ 500 mm, set by pitch and tier spacing; confirmed against the tallest item

Figures are typical configuration ranges; exact specifications are set per project.

Options

  • Intermediate entry/exit points
  • Antistatic or food-grade belt
  • Higher side guards for polybags

Scope of supply

  • Machine, drives and control cabinet, assembled and dry-run tested before shipping
  • The equipment's own control and fleet software; interfaces to your existing WMS / ERP as the project requires
  • Drawings: general arrangement, foundation and anchor plan, electrical schematics
  • Conformity documents for the equipment and the whole line, the split of responsibilities and the acceptance criteria are set out in the contract according to the project scope
  • Spare-parts list and wear-part recommendation; a first batch can ship with the equipment
  • Factory acceptance (FAT): attend in person or follow by live video
  • Installation, commissioning and operator training can be included in the offer

What we need for an offer

  • Floor-to-floor height and number of levels
  • Load size, weight and hourly volume
  • Available floor space

Related equipment

Request an offer for this equipment