Skip to Content

Conveyors

These are the equipment modules our projects are built from. Figures on each page are typical configuration ranges; the actual specification is designed around your site, your loads and your peak hourly throughput.

Submit project requirements

Telescopic belt conveyor
Installed at the dock door and extended into the truck or container, so loose cartons and parcels go straight on and off the vehicle without being carried the length of the vehicle.
Drum motor (motorised pulley)
Motor and gearbox sealed inside the pulley to drive a belt conveyor directly: compact, low-maintenance, wash-down versions for food, supplied with new conveyors or on its own as a spare.
Power and free overhead conveyor
Drive chain and load track are separate, so carriers can stop, queue and switch tracks; common on paint and assembly lines for cars, appliances and furniture, with a continuous enclosed-track entry model.