24V MDR zero-pressure accumulation conveyor
One 24 V motor roller per zone: loads queue without touching, zones run only when there is a load. For buffering and releasing cartons and totes on demand.
One 24 V motor roller per zone: loads queue without touching, zones run only when there is a load. For buffering and releasing cartons and totes on demand.
One 24 V motor roller per zone: loads queue without touching, zones run only when there is a load. For buffering and releasing cartons and totes on demand.
A 24 V MDR (motor-driven roller) conveyor is divided into zones. Each zone has one motor roller, with motor and gearbox inside the tube, driving several idler rollers, and a photo-eye at the zone. When the zone ahead is occupied, the zone behind stops and waits, so loads never touch or push each other; release can be one by one or in batches. Empty zones stand still, so the line is usually quieter and uses less energy than a conveyor that runs all the time. Motor rollers and zone control cards are also supplied on their own as spare parts.
| Zone length | About 450–900 mm, set by the load length |
|---|---|
| Speed | About 0.3–1.0 m/s |
| Load per zone | About 45 kg (depends on the motor roller) |
| Motor roller | Ø50 mm, 24 V; 48 V models also available |
| Roller pitch | About 75–150 mm |
| Control | A photo-eye in every zone; each control card manages one or more zones, depending on the model, and runs the zero-pressure logic |
Figures are typical configuration ranges; exact specifications are set per project.