Skip to Content

Roller conveyor

The basic line for cartons and totes, with optional zero-pressure accumulation on motorised rollers; modular sections.

The basic line for cartons and totes, with optional zero-pressure accumulation on motorised rollers; modular sections.

Roller conveyors move cartons and totes horizontally between stations. With 24 V or 48 V motorised-roller zones, each zone starts and stops on its own, so cases accumulate without pressing against each other: the usual arrangement ahead of a sorter, feeding pick stations or buffering outbound lanes. Straight, curve, merge and divert sections come in standard lengths; on site they are positioned, levelled, wired and commissioned zone by zone.

Typical uses

  • Induction and outbound lines in e-commerce and parcel hubs
  • Finished-goods cartons from production to warehouse
  • Tote loops between pick stations
  • Accumulation and gapping ahead of a sorter

Key figures

Load size200–1,200 mm long, 150–1,000 mm wide
Unit weight≤ 50 kg (heavy-duty ≤ 150 kg)
Speed0.3–1.5 m/s, adjustable per zone
Roller diameterØ50 / Ø60 / Ø76 mm, zinc-plated or stainless
Width400–1,200 mm
DriveMotorised-roller zones (24 V / 48 V) or three-phase gear motor with O-belts or chain
AccumulationZero-pressure (ZPA), single or train release
Environment-10 °C to +40 °C; cold-store and wet-area versions available

Figures are typical configuration ranges; exact specifications are set per project.

Options

  • Curves 30° / 45° / 90° / 180°
  • Skewed-wheel merge and pop-up transfer
  • Barcode / RFID reading gantry
  • Stainless-steel frame for food and pharma
  • Manual or pneumatic lift-gate sections

Scope of supply

  • Machine, drives and control cabinet, assembled and dry-run tested before shipping
  • The equipment's own control and fleet software; interfaces to your existing WMS / ERP as the project requires
  • Drawings: general arrangement, foundation and anchor plan, electrical schematics
  • Conformity documents for the equipment and the whole line, the split of responsibilities and the acceptance criteria are set out in the contract according to the project scope
  • Spare-parts list and wear-part recommendation; a first batch can ship with the equipment
  • Factory acceptance (FAT): attend in person or follow by live video
  • Installation, commissioning and operator training can be included in the offer

What we need for an offer

  • Size and weight range of the loads, and whether polybags or irregular items occur
  • Route sketch or floor plan, total length and levels
  • Peak hourly throughput
  • Interfaces to existing equipment or WMS

Related equipment

Request an offer for this equipment