Merge and divert modules
Pop-up transfers, skewed-wheel merges and arm diverters that join lines or split them.
Pop-up transfers, skewed-wheel merges and arm diverters that join lines or split them.
Pop-up transfers, skewed-wheel merges and arm diverters that join lines or split them.
Merge and divert modules are the junctions of a conveyor line. A pop-up transfer turns cases 90° onto another line, a skewed-wheel merge joins two lines into one while gapping, and an arm or pusher diverter sends cases to a few side lanes. For a small number of destinations they are the most economical alternative to a sorter.
| Pop-up transfer | Roller or belt type, ≤ 1,500 cases/h, ≤ 50 kg |
|---|---|
| Skewed-wheel merge | 30° / 45°, automatic gapping |
| Arm diverter | ≤ 2,400 items/h, one or two sides |
| Curve conveyor | 30° / 45° / 90° / 180°, tapered rollers |
| Control | PLC, linked to upstream scanning and WCS |
Figures are typical configuration ranges; exact specifications are set per project.