Skip to Content

Belt conveyor

For polybags, small items and inclines; telescopic versions reach into the truck for loading and unloading.

For polybags, small items and inclines; telescopic versions reach into the truck for loading and unloading.

Belt conveyors handle what rollers do not: polybags, small items, loads with uneven bottoms, and sections that climb or descend. Common forms are flat belts, incline belts, telescopic boom conveyors and sorter induction belts. A telescopic belt extends into the trailer at the dock, so the crew only lifts cartons inside the vehicle, which raises dock throughput and reduces strain.

Typical uses

  • Truck unloading, loading and inclines in parcel hubs
  • Polybags and small items in e-commerce warehouses
  • Acceleration and induction sections ahead of a sorter
  • Continuous inclines between floor levels

Key figures

Belt width400–1,400 mm
Speed0.5–2.5 m/s
Incline≤ 18° (cleated belt ≤ 25°)
Load≤ 80 kg/m
Telescopic conveyorExtension 6–20 m, tilt and lift, remote control
Belt materialPVC / PU; antistatic, oil-resistant or food-grade on request
DriveDrum motor or external gear motor

Figures are typical configuration ranges; exact specifications are set per project.

Options

  • Lighting, operator panel and safety edge on the telescopic head
  • Two- to five-stage extension: two or three stages for 6–12 m reach; four or five stages for 15–20 m, covering a 13 m trailer
  • Counting photocells and weighing section
  • Variable-speed drive

Scope of supply

  • Machine, drives and control cabinet, assembled and dry-run tested before shipping
  • The equipment's own control and fleet software; interfaces to your existing WMS / ERP as the project requires
  • Drawings: general arrangement, foundation and anchor plan, electrical schematics
  • Conformity documents for the equipment and the whole line, the split of responsibilities and the acceptance criteria are set out in the contract according to the project scope
  • Spare-parts list and wear-part recommendation; a first batch can ship with the equipment
  • Factory acceptance (FAT): attend in person or follow by live video
  • Installation, commissioning and operator training can be included in the offer

What we need for an offer

  • Load types (cartons, polybags, sacks) and weight range
  • Height to climb, or dock-to-trailer distance
  • Hourly throughput and trucks per day
  • Dock and vehicle dimensions

Related equipment

Request an offer for this equipment