Long-goods and sheet-metal storage
Profiles and tubes in a cantilever AS/RS, steel and aluminium sheets in a pallet-type sheet tower; the tower can load laser cutters automatically.
Profiles and tubes in a cantilever AS/RS, steel and aluminium sheets in a pallet-type sheet tower; the tower can load laser cutters automatically.
Profiles and tubes in a cantilever AS/RS, steel and aluminium sheets in a pallet-type sheet tower; the tower can load laser cutters automatically.
Long goods and sheet metal do not fit a normal pallet AS/RS. Profiles and tubes, commonly 4–12 m long, go on cantilever racks and are handled bundle by bundle by a stacker crane or bridge unit with a long-goods gripper or cassettes. Steel and aluminium sheets go on pallets in a sheet tower, moving in and out pallet by pallet, and can feed a laser cutter automatically. Both are designed around the material length or sheet size and the bundle or pallet weight.
| Long-goods length | Commonly about 4–12 m, some systems up to about 14 m |
|---|---|
| Long-goods store | Cantilever racks; stacker crane or bridge unit with long-goods gripper or cassettes |
| Long-goods load | Cassette systems rated about 1–8 t per cassette by vendors, with 5 t and 8 t models published; cantilever racks about 0.25–2.5 t per arm |
| Sheet tower | Sheet sizes commonly 3,000×1,500, 4,000×2,000 and 6,000×2,000 mm; 3 t per pallet level, 5 t optional; about 8–20 levels |
| Throughput | Long-goods stores about 20–60 cycles/h in vendor data, about 15–25 dual cycles/h in another source; one published sheet-tower load/unload cycle is about 135 s, confirm against levels and travel |
| Integration | Sheet tower loads laser cutters automatically; links to saws confirmed separately |
| Management | Tracks cassette and pallet positions and connects to ERP / WMS to manage stock by size, batch and offcuts |
Figures are typical configuration ranges; exact specifications are set per project.