Pallet stretch wrapper
Wraps the whole pallet load tight in stretch film against shifting, dust and splashes; turntable, rotary-arm and rotary-ring types by throughput.
Wraps the whole pallet load tight in stretch film against shifting, dust and splashes; turntable, rotary-arm and rotary-ring types by throughput.
Wraps the whole pallet load tight in stretch film against shifting, dust and splashes; turntable, rotary-arm and rotary-ring types by throughput.
A stretch wrapper wraps the pallet load tight in stretch film so it does not shift in transport and stays cleaner; rain protection needs a top sheet or hood. There are three common types: on a turntable wrapper the pallet rotates, the simplest and most widely used; on a rotary-arm wrapper the pallet stands still and the film carriage circles it, for heavy or unstable loads; on a rotary-ring wrapper the carriage runs on a horizontal ring, the fastest, for large beverage lines and distribution centres. A powered pre-stretch carriage stretches the film before it goes on, which clearly reduces film use.
| Type | Turntable, rotary arm, rotary ring |
|---|---|
| Throughput | Semi-automatic turntable about 20–40 pallets/h (about 18–25 with top sheet); rotary arm about 65–120/h; rotary ring typically stated at about 20–160/h; actual rates depend on wrap layers, load and handling |
| Turntable capacity | Commonly about 2,000 kg |
| Pre-stretch | Powered, typically 200–300% |
| Pallets | EUR 1200×800, industrial 1200×1000 and others |
| Loading | Forklift or inline conveyor |
Figures are typical configuration ranges; exact specifications are set per project.