Skip to Content

Strapping machines (carton and pallet)

PP strap is usual for cartons, PET for pallets; semi-automatic, automatic and unmanned inline machines, with top press and corner boards as options.

PP strap is usual for cartons, PET for pallets; semi-automatic, automatic and unmanned inline machines, with top press and corner boards as options.

Strapping machines tie cartons or whole pallet loads with plastic strap. Carton strappers mostly use PP strap: semi-automatic models are threaded by hand; automatic models have an arch, so the operator pushes the carton in and it is strapped at the touch of a button, and with a conveyor plus positioning, detection and interlocks they run unmanned. Pallet strappers mostly use stronger PET strap and run inline, strapping horizontally (against sideways shifting) or vertically (tying the load to the pallet); loose or compressible loads get a top press, and corner boards stop the strap cutting into cartons.

Typical uses

  • Securing cartons in factories and e-commerce warehouses
  • Bundling printed matter and textiles
  • Pallet strapping for beverages, building materials, paper and appliances
  • Final securing after palletizing and wrapping

How to choose

  • Daily volume: semi-automatic for small, automatic or inline for large
  • Whether it connects to a conveyor
  • Maximum carton or pallet size: the arch needs a margin
  • Choose the strap by load, tension and tension retention: loose or compressible loads usually take PET strap, with a top press where needed
  • Horizontal strapping against sideways shifting, vertical to tie the load to the pallet

When it is not the right choice

  • Very low volume: a battery hand tool is enough
  • Steel coils and other heavy loads: assess load securing first and use a dedicated steel-strap or heavy-duty solution
  • Fragile loads that need a top press: assess the press force first

Key figures

Carton strapping speedSemi-automatic about 3 s per strap; automatic about 1.5–2.5 s
PP strapAbout 5–15 mm wide
Carton archAbout 650×500 to 850×600 mm
Pallet strapPET, about 9–19 mm wide
Pallet strap tensionAbout 1,100–3,200 N
Pallet throughputAbout 60–120 pallets/h, depending on horizontal or vertical strapping, number of straps and top press

Figures are typical configuration ranges; exact specifications are set per project.

Options

  • Unmanned inline carton strapping, one or several parallel straps
  • Cross strapping with a turning unit
  • Top press for pallets
  • Automatic corner-board placement
  • Strapping heads and wear parts supplied separately

Scope of supply

  • Machine, drives and control cabinet, assembled and dry-run tested before shipping
  • The equipment's own control and fleet software; interfaces to your existing WMS / ERP as the project requires
  • Drawings: general arrangement, foundation and anchor plan, electrical schematics
  • Conformity documents for the equipment and the whole line, the split of responsibilities and the acceptance criteria are set out in the contract according to the project scope
  • Spare-parts list and wear-part recommendation; a first batch can ship with the equipment
  • Factory acceptance (FAT): attend in person or follow by live video
  • Installation, commissioning and operator training can be included in the offer

What we need for an offer

  • Carton or pallet size and weight
  • Daily or hourly quantity
  • Number and direction of straps
  • Strap currently used
  • Whether it connects to a conveyor or stretch wrapper

Related equipment

Request an offer for this equipment