Tote-handling AMR
A roller or belt top docks itself to station conveyors, so totes move between lines without anyone pushing a cart.
A roller or belt top docks itself to station conveyors, so totes move between lines without anyone pushing a cart.
A roller or belt top docks itself to station conveyors, so totes move between lines without anyone pushing a cart.
A tote-handling AMR carries a roller or belt module on top and docks automatically to station conveyors to move totes, cartons or trays between workstations and the store. It replaces fixed conveyors with flexible routes, so line changes need no mechanical rework. Laser SLAM navigation allows safe operation in areas shared with people.
| Load | 100–300 kg |
|---|---|
| Top module | Single or double roller / belt deck, bidirectional docking |
| Totes | 600×400 mm standard totes and cartons |
| Navigation | Laser SLAM for travel; docking to conveyors by stops, pin locators or secondary positioning, about ±5–10 mm |
| Speed | ≤ 1.5 m/s |
| Battery | Lithium, automatic charging |
| Safety | Safety scanners, emergency stop, audible and visual warning |
Figures are typical configuration ranges; exact specifications are set per project.