Skip to Content

Spare parts and MRO distribution

Spare-parts and MRO warehouses hold many SKUs with a long tail: many items move only a few times a year, but each time they have to be found and shipped correctly. These are the usual tasks and the equipment for each.

Miniload AS/RS

Typical tasks

  • Dense storage of many slow-moving SKUs
  • Picking many order lines with small quantities
  • Mixed sizes: small parts in totes, large parts on pallets
  • Packing, measuring, weighing and shipping by order

What to send us: A list of SKUs with sizes, weights and movement frequency, order lines per day, the share of small and large items, and a site plan.

Common questions

What is the most compact way to store slow-moving SKUs?

Small parts are usually stored in a miniload or with case-handling robots, large parts in narrow aisles or a pallet AS/RS. Zones are set by SKU size, quantity and movement frequency, and calculated per project.

What if item sizes vary a lot?

Usually the range is split into a tote zone and a pallet zone, with oversized items stored separately. We need your SKU list with sizes and weights.

Not sure where your project fits?

Send us a layout, your volumes and what moves through the site. We suggest the modules and calculate the throughput.