Skip to Content

Autonomous forklift AGV

Laser navigation, no floor changes. Pallet trucks handle floor-level moves, stackers and reach trucks put away to racking; automatic charging supports multi-shift operation.

Laser navigation, no floor changes. Pallet trucks handle floor-level moves, stackers and reach trucks put away to racking; automatic charging supports multi-shift operation.

An autonomous forklift navigates an existing warehouse by laser SLAM, picking up, carrying and placing pallets with no magnetic tape or floor codes. Forms include pallet trucks, stackers, reach trucks and counterbalance trucks. Pallet trucks only lift the pallet clear of the floor; stackers reach about 5.5 m, reach trucks about 9 m and counterbalance trucks about 3–4.5 m. Safety laser scanners and bumpers allow mixed operation with people and manual trucks. Fleet software assigns tasks and charging is automatic.

Typical uses

  • Pallet moves from dock to storage
  • Line feeding and finished-goods removal in production
  • Links between AS/RS entries and conveyors
  • Night-shift and cold-store operation without staff

Key figures

Load1,000–2,000 kg (3,000 kg optional)
Lift heightPallet truck lifts about 0.2 m; stacker about 1.6–5.5 m; reach truck about 4.5–9 m; counterbalance about 3–4.5 m
NavigationLaser SLAM, repeatability ±10 mm
Speed1.2–2.0 m/s
BatteryLithium, automatic charging, 8–10 h per charge
SafetyFront and rear safety scanners, fork-tip detection, ISO 3691-4
EnvironmentStandard version about 0 °C to +40 °C; cold-store version about -20 °C to +5 °C. Moving in and out of cold stores needs a separate condensation assessment
FleetMulti-vehicle fleet manager with WMS interface

Figures are typical configuration ranges; exact specifications are set per project.

Options

  • Door and lift integration
  • Floor-stack and rack modes
  • 3D camera pallet detection
  • Mixed fleet management (autonomous + manual)
  • Compact laser-guided stacker (1.5 t class) working with four-way pallet shuttles, handing over pallets at the aisle end
  • Omnidirectional models: sideways travel and turning on the spot, working in aisles of about 1.9 m (1 t class)

Scope of supply

  • Machine, drives and control cabinet, assembled and dry-run tested before shipping
  • The equipment's own control and fleet software; interfaces to your existing WMS / ERP as the project requires
  • Drawings: general arrangement, foundation and anchor plan, electrical schematics
  • Conformity documents for the equipment and the whole line, the split of responsibilities and the acceptance criteria are set out in the contract according to the project scope
  • Spare-parts list and wear-part recommendation; a first batch can ship with the equipment
  • Factory acceptance (FAT): attend in person or follow by live video
  • Installation, commissioning and operator training can be included in the offer

What we need for an offer

  • Pallet sizes, loads and quality
  • Routes and tasks per hour
  • Rack heights and aisle widths
  • Floor condition, ramps and doors

Request an offer for this equipment