Under-ride lifting AGV
Drives under a shelf unit or cart, lifts it and goes: the robot behind shelf-to-person picking and line-side delivery.
Drives under a shelf unit or cart, lifts it and goes: the robot behind shelf-to-person picking and line-side delivery.
Drives under a shelf unit or cart, lifts it and goes: the robot behind shelf-to-person picking and line-side delivery.
An under-ride lifting AGV is a low mobile robot that drives under a shelf unit or cart, lifts it and carries the whole unit to a workstation or line-side position. In shelf-to-person systems it brings the entire shelf to the picker; in factories it delivers material carts from the store to the line. Navigation uses floor codes or laser SLAM, and fleet software runs hundreds of robots at once.
| Load | 500–1,500 kg |
|---|---|
| Lift stroke | About 60 mm |
| Navigation | Floor codes (±5 mm) or laser SLAM |
| Speed | 1.5–2.0 m/s |
| Body height | About 250–300 mm; blade-type low-profile models about 125 mm, to fit under lower carts and racks |
| Battery | Lithium, automatic charging |
| Shelf units | Total shelf or cart weight within the selected model's payload; shelves can be picked from several faces |
| Fleet | Multi-robot fleet manager with WMS/MES interface |
Figures are typical configuration ranges; exact specifications are set per project.