Tugger AGV
Tows a train of carts on fixed routes between store and line; suited to in-plant delivery with many stops and a steady cycle.
Tows a train of carts on fixed routes between store and line; suited to in-plant delivery with many stops and a steady cycle.
Tows a train of carts on fixed routes between store and line; suited to in-plant delivery with many stops and a steady cycle.
A tugger AGV pulls a train of carts on set routes between the store, the supermarket area and line-side stations. Compared with moving one pallet at a time, one trip serves several stations, which suits assembly plants with steady takt times in automotive components, appliances and electronics. Navigation is laser SLAM with no floor changes; carts can be coupled automatically or by hand, and stops are set per station.
| Towing capacity | 1,000–5,000 kg (whole train) |
|---|---|
| Carts | 1–5, depending on aisles and turning radius |
| Navigation | Laser SLAM, repeatability ±10 mm |
| Speed | ≤ 1.5 m/s (loaded speed limited per route) |
| Coupling | Automatic or manual hitch |
| Battery | Lithium, automatic charging |
| Safety | Front and rear safety scanners, emergency stop, audible and visual warnings; ISO 3691-4 |
Figures are typical configuration ranges; exact specifications are set per project.