AS/RS retrofit and pallet profile check
New controls, positioning, conductor rails and safety devices for existing AS/RS; a profile check at the infeed keeps over-height, over-width, overhanging and overweight pallets out.
New controls, positioning, conductor rails and safety devices for existing AS/RS; a profile check at the infeed keeps over-height, over-width, overhanging and overweight pallets out.
New controls, positioning, conductor rails and safety devices for existing AS/RS; a profile check at the infeed keeps over-height, over-width, overhanging and overweight pallets out.
After ten or more years many stores still have sound mechanics, but the controls are obsolete, spares are hard to find, positioning drifts and the safety devices no longer meet current requirements. A retrofit can replace just the controls and WCS interface, or also the positioning, conductor rails, forks and safety devices, at far less cost and downtime than rebuilding. A profile check station at the infeed uses light curtains and photocells to detect over-height, over-width, over-length and overhang, with a scale for overweight, and sends rejected pallets back before they enter an aisle, reducing jams and accidents.
| Controls | PLC, drives, remote control and WCS interface, matched to the machine and systems |
|---|---|
| Positioning | Laser measurement (straight aisles, published range up to about 300 m) or barcode positioning (incl. curves) |
| Power supply | Conductor rail for long travel, current per the crane (published series about 50–400 A); about 500 m/min is the rail rating, not crane speed; energy chain for short travel |
| Safety | Overspeed protection, end buffers, access-gate interlocks and more, with rope-break and slack-rope protection on rope hoists; to EN 528 and the project risk assessment |
| Profile check | Light curtains for over-height and over-width, photocells or scanners for over-length and overhang; optional weighing and pallet-bottom inspection |
Figures are typical configuration ranges; exact specifications are set per project.